Closed
Milestone
Jul 1, 2024–Jul 7, 2024
the path to the third MVP
During this sprint, it is necessary to develop an interface to switch from the console version to the desktop. It is also necessary to make the metrics output to a separate file, and not to the console.
Loading
Loading
Loading
Loading